研究在高内水压力下, T BM 开挖隧洞中管片衬砌能否承担内水压力作用且结构强度满足设计要求的问题, 主 要针对管片衬砌结构接缝对衬砌整体应力的影响。以某水电站长距离引水隧洞为例, 采用有限元法建立三维模型, 计算发现在内水压力作用下, 管片分块衬砌受力规律不同于常规现浇混凝土衬砌, 管片之间螺栓连接受力集中, 接 缝处产生了应力释放, 使得管片其他部位应力降低, 而且配筋量较同水头下整体现浇混凝土配筋量大大减少。
[Key word]
[Abstract]
In this paper, the pr oblems w hether the segment lining of TBM ex cavation tunnel can sustain the internal pressur e and st ructur e st reng th can meet the desig n requirements under high int ernal water pressure w ere investig ated, and t he effects of seg2 ment lining structure jo int on the over all stress of lining w ere analy zed. , Finite element method was used to dev elo p the thr ee2 dimensional model o f a lo ng2dist ance tunnel at a hy dr opow er st ation. T he results showed that under the internal water pressure, the str ess o f block segment lining is different fr om that o f conventio nal cast2concrete lining, str ess is concent rated at the bo lt co nnection of segment, stress r eleases at t he seam to cause t he decreasing str ess in ot her parts of segment, and the reinfo rcement co ncr ete volume is g reat ly reduced com par ed w ith that of the ov erall cast2in2place co ncr et e.
[中图分类号]
[基金项目]